DUNAPACK – Office transformations, reconstructions
Area built: 2.350m2
Handover date: 2023
At DUNAPACK sites (Csepel, Nyíregyháza) we have rebuilt the existing offices, built new restaurants, kitchens, moved or constructed new offices, by separating areas from the building and the halls. We have renewed the electrical network, building machinery and fit-out. We have done the works in several rounds, based on pre-agreed construction schedule with the minimum disturbance on office and operative works, the last renewed area was handed over in 2023.



Offices - Current projects
MERCEDES Head Ofice – Office fitout and
refurbishment works
1.000m2 - 2025
1.000m2 - 2025
DUNAPACK – Office transformations, reconstructions
2.350m2 - 2023
2.350m2 - 2023
MacDermid – Office transformations, reconstruction
1.500m2 - 2023
1.500m2 - 2023
Offices - Previous projects
RTL Klub – Office refurbishment
1.500m2 - 2021
1.500m2 - 2021
Biatorbágy – Office transformation
600m2 - 2022
600m2 - 2022
Corvin One – Office and blood plasma center fit-out works
3.400m2 - 2019
3.400m2 - 2019
Our projects
Residential buildings,
design to build family
houses & mansions
design to build family
houses & mansions
Offices
Retail units and accomodation
Industrial
and logistic halls
and logistic halls

